|
Mesquite Hailey Pump
Station and Ground Storage Tank
|
|
Project
included a 25-MGD high-Service pump station and 5-MG
prestressed concrete ground storage tank. Pump station
included five vertical turbine pumps in a dry pit arrangement,
a control room, an ammonia room, and a packaged
chlorine/scrubber equipment.
|
|
Services
Provided: Survey, Geotechnical,
Preliminary Design, Final Design, Construction
Administration
Project
Cost: $2.6 Million – Pump Station $2.0
Million – Tank |
|
|

|
|
City of
Mesquite1515 North
Galloway Mesquite, Texas 75149 Mr. Earl Deland,
P.E. 972-216-6216 |
|

|
|
|
|
|
|
| |