Erosion and Sedimentation
Study
The Running Bear Park project included several analysis and
design phases. The improvements included preliminary and final
design of ponds and outlet structures, retaining walls, rough
grading of recreational facilities, channel cutoff channel,
and park entrance road. The improvements to the adjacent
residential levee system included a gated discharge pipe,
electrical improvements, and raising the levee elevations. The
project involved permitting requirements for a 404 permit from
the Corps of Engineers, Conditional Letter of Map Revision
from the Federal Emergency Management Agency, and a Corridor
Development Certificate Permit. Permitting required the
evaluation of wetland impacts and design of appropriate
mitigation measures. |
|