South Mesquite Channel
Improvements
South
Mesquite Creek Flood and Erosion Control - Mesquite,
Texas
This project involved the analysis and design of a flood control
project for approximately 10,000 linear feet of South Mesquite
Creek. The work included hydrologic and hydraulic analyses as well
as structural design of channel sections, retaining walls, box
culverts and numerous utility relocations. Coordination with the
Corps of Engineers was required for a Section 404 permit and LOMR
submittal for Phases 1-3. The project was divided into 4 phases.
Phases 1 through 4 have been completed. The cost for all 4 phases
was approximately $8.2 million.
|